🏭 Work 5/17/2010 – 12/9/2010

Enrico Fermi Nuclear Generating Station Unit 1

Michaelwho went
Lead MARSSIM (Radiological) Engineer
Bartlett

Newport, MI — 6400 N Dixie Hwy

What I did here

Primary responsibility was the authoring of the FSS (Final Status Survey) Report, in support of the NRC License Termination. Other Developed FSSPs (Final Status Survey Plan) in accordance with the MARSSIM (Multi-Agency Radiation Survey and Site Investigation Manual) protocol employing the Data Quality Objective (DQO) process to ensure that the type, quantity, and quality of data gathered was appropriate for the DQA (Data Quality Analysis) process and that the resultant decisions were technically sound and defensible. Performed Historical Data Reviews, and Peer Reviews. Calculated and assigned DCGLGA, DCGL fractions, DCGL surrogates for HTD nuclides, and elevated measurement DCGLs. Reviewed DQOs and survey designs for consistency between DQO output, sampling design and other data collection documents. Performed statistical analysis of survey data. Performed ALARA evaluations to determine if additional remediation was warranted. Drew conclusions from the data, and documented any deficiencies and recommendations for improvement. Directed the work of 12 FSS Technicians. MARSSIM/NRC Reactor D&D.

Places