Travels of the Rennhack family
🏭 Work 1/9/1995 – 2/17/1995

Buchanan, NY — Broadway
Set up/operated the Tri -Nuke system. Made power entries. Decontaminated the S/G platforms. Collected and shipped radwaste. Installed/removed shielding. Setup and maintained HEPA's. Decontaminated the containment and auxiliary building as well as areas and equipment. Fabricated and installed containments. Picked up and distributed supplies. Assumed housekeeping duties. Changed out filters.